Flocci Projects

HomeSolutions › Agile Tool for College & Capstone Project Teams

Run your college project like a real engineering team

Student teams get the full agile loop free: a shared-flow board, a backlog, sprints with goals and dates, story points and velocity insights. It costs nothing for a personal board, needs no credit card, and teaches the exact vocabulary — backlog, sprint, story points, velocity, epic — that internship and placement interviews ask about.

Who this page is for: Engineering students, capstone teams and hackathon groups in India and beyond.

College projects fail on coordination, not capability. Four people, one WhatsApp group, and a submission deadline produces the classic pattern: everything happens in the last week because nobody could see what was actually done. A board turns that invisible state visible — and the Review column, in particular, catches the group project's real killer, which is work that one person considers finished and another has never seen.

The pedagogy is a genuine bonus. Running two-week sprints on a capstone means you can answer 'tell me about your process' in an interview with specifics: our velocity was about eighteen points, we split the payment epic into six stories, we cut two of them after sprint two. That is a materially better answer than 'we divided the work', and you learned it by doing rather than from a slide deck.

Practically: sign in with Google using your college account, use the seeded sandbox project to see what a populated board looks like, then create your own. The Library wiki on the same login is where the report and the design docs live, and an issue can attach the page it implements — which is also how you assemble the final submission without a frantic archaeology session the night before.

What you get

Start free with Google sign-in

Frequently asked questions

Is Flocci Projects free for students?

The personal board is free for everyone, students included, with no issue cap and no expiry. A shared board for the team requires an organization; seats beyond the free allowance are ₹49/seat/month, which for a four-person project team is under ₹200.

How long should a student team's sprint be?

One or two weeks, matched to your review cadence with the guide or supervisor. A one-week sprint suits a semester project with weekly check-ins; two weeks suits a capstone with fortnightly reviews. Keep the length constant so velocity means something.

What should we put in the backlog first?

The submission requirements, one item per deliverable, then split anything that will take more than a few days. If the project is still a paragraph, the AI backlog breakdown will draft a first structure from your description that you can then argue with — which is faster than a blank page.

Will this help in placement interviews?

Indirectly but genuinely: interviewers ask how you organised the work, and having real sprint goals, estimates and a velocity history lets you answer with evidence. The tool does not create the story, but running the process properly does, and the tool makes the process cheap enough to actually run.

Related solutions